Start Z

This parameter allows to define the Z of the first point of the operation..

Five solutions are available :

 

None

No lead in.

Incremental value

An incremental value from the points to measure is used to define the lead in point.

Absolute value

An absolute value (in the current Wcs)  defines the lead in points.

Z Security block

The lead in points are defined on the security block in the current Wcs.

Finish Z

The lead in are defined along the enclosing block of the part in the current Wcs

 

Topsolid online Help Index

Your Ad Here