Lead out distance
This (A) lead out distance and (B) lead out angle are defined according to the levelling method:
Levelling method = None
This A lead out distance is applied for each roughing pass.
Levelling method = At end of roughing operation
This A lead out distance is applied for each roughing pass.
Levelling method = At end of each pass
This A lead out distance is applied for the last each roughing pass.
Levelling method = At the end of each pass if necessary
This A lead out distance is applied for each roughing pass which does not require levelling

Topsolid CAM online Help Index