Split Operation dialog box

Your Ad Here




See Split Operation under the NC Operations Manager Toolbar.

image\SPLITOP_shg.gif

Split Operation At Every Tool Change

Every tool change encountered in the operation will become a separate operation. A tool change is the sequence of record(s) which begin with the coordinate system information record and end with the tool change record.

Split Operation At Tool Change If Different Tool Number

A tool change sequence will not become a separate operation (as above) if the tool number is the same as the tool number in previous operation.

Return to SURFCAM Index


Your Ad Here