This dialog box is used to import an existing operation. Select the name of the operation from the drop down list and click OK. All of the moves of the operation will now be displayed in the table.
For drilling operations, canned cycles are replaced with linear moves.
All safety rail moves for turning operations are removed before the operation is copies. It is up to the user to draw the desired safety rail moves.