CF - Verify All Members Passed



Your Ad Here

When the Design menu > Concrete Frame Design > Verify All Members Passed command is used, the program reports if structural members passed the stress/capacity check.

Use the Design menu > Concrete Frame Design > Verify All Members Passed command as follows:

  1. Click the Analyze menu > Run Analysis command to run an analysis.

  2. Click the Design menu > Concrete Frame Design > Start Design/Check of Structure command to run the design.

  3. Click the Design menu > Concrete Frame Design > Verify All Members Passed command.

SAP2000 will display a pop-up box indicating the outcome of the verification. If structural members failed, the program will select those members if instructed to do so.

Return to SAP2000 Index