A typical walkout basement has an upper flat region where you enter the house on the first floor, and a lower flat region where you walk out to ground level from the basement.
The second floor deck was not given structural supports because there was a deck beneath it. We can take care of that manually.
- Return to floor plan view.
- On the first floor, group-select the deck railing and open it for specification.
- On the Railing tab of the Deck Railing Specification dialog check Post to Beam and click OK. See "Railing Tab".
- Take a look in a 3D view .
- A section of our first floor deck railing should not have the Post to Beam attribute checked. Return to floor plan view and turn on the Reference Display
.
- Select Build> Wall> Break Wall
and place a break in the deck railing where the second floor deck above recedes.
- Select the remaining section of deck railing and uncheck Post to Beam on the Railing tab.
- Turn off the Reference Display
.
- Take a look in a 3D view.