Chief Architect X1



Your Ad Here

Editing Schedules

Schedules can be edited using the edit handles, the edit toolbar buttons, or the Schedule Specification dialog. See "Schedule Specification Dialog".

Edit Handles

A selected schedule has the same edit handles as a CAD box. See "Editing Box-Based Objects".

In addition, schedules have edit handles along the side of each column, in the Schedule heading near the top. Click and drag one of these handles to adjust the width of the columns on either side.

The behavior of the edit handles may depend on the currently active Edit Behavior. See "Edit Behaviors".

Using the Edit Buttons

A selected schedule can be edited in a variety of ways using the buttons on the edit toolbar. As with most objects, schedules can be copied, replicated, moved, deleted, etc. See "Using the Edit Toolbar".

The following edit toolbar buttons may display on the edit toolbar for a selected schedule.

Converting Schedules to Text

Click the Schedule to Text edit button to convert the selected schedule to a tabbed text object. You can then edit the schedule as text.

When a schedule is converted to text, it no longer updates automatically. In addition, shaped labels displaying as specified in the schedule's specification dialog will no longer be present.

You can copy the text from the Text Specification dialog and paste it into other applications.


Chief Architect
www.chiefarchitect.com
Your Ad Here